Mezhregionflot

2018
Complex of works:

Complete scope of detailed design and construction, fit-out and engineering works at office premises.

Area:
1 450 m2
Type of work:
General contractor
Address:
2 Odesskaya str., 9th floor, Moscow, Russia BC «Lotos»
Dates:
Start - 25.05.2018, End - 10.10.2018
Status:
Completed 100%

Mezhregionflot: “Simple” Means “Effective”

Gint-M completed all the works needed to create office space for Mezhregionflot, including conceptual development, detailed design, construction, fit-out, as well as MEP installation. The 1,450-sqm office is accommodated in BC Lotos at 2, Odesskaya str.

Mezhregionflot is a management company for a number of businesses engaged in freight transportation by water. This fact is reflected in the new office interior. Right at the entrance visitors see a large luminous steer wheel, while in the workspace they come across various attributes of river steamship like tugboats, oil tankers, forklifts depicted on glass partitions. There is dark-blue carpeting in the hallway, emblematic of water elements, whereas sand-colored floors in workspaces are associated with dry land. “Despite the client’s basic wishes for the new interior being plainness, comfort, and practicality, we suggested corporate features to be added to the project, to help clients and visitors identify the company through the interior,” says Artem Panteleev, Business Development Director, Gint-M.

«

Mezhregionflot collaborated with Gint-M, the latter acting as a building contractor for a corporate office accommodated in BC Lotos at 2, Odesskaya str., Moscow. Gint-M performed a full range of works needed to create an interior for our company, including conceptual development, detailed design, construction, fit-out, MEP installation.

Reviewed fully

Modern-style open space layout adjoins the meeting area and walled offices for top management. The project’s distinct feature is that the customer prepared office space for lease (two lots - 400 sq. m and 200 sq. m), so the contractor, besides the integrated fit-out of Mezhregionflot office, had to do some basic repair of extra areas as well: wall painting, raised floor setup, carpet laying, MEP installation (fan coils, sprinklers, lighting, access doors) that the tenant could immediately move into the premises and start a working process. The task was fulfilled and today the spaces are all ready — besides the above-listed options, there is also a tailor-made kitchen, equipped wardrobe rooms, spacious and sunlit open space, etc.

“It took Gint-M 100 days to deliver this turnkey project, which is a very tight schedule. For all that, the quality was never compromised: we got an excellent functional interior that is totally in line with our corporate needs,” says Oleg Leonenko, Chief of Staff, the Assistant Director General, Mezhregionflot