BMW

2011
Complex of works:

Complete scope of scheme and detailed design, construction, fit-out and engineering works at office premises.

Area:
4 800 m2
Type of work:
General designer, general contractor
Address:
39 Leningradskoe shosse., Moscow, Russia BC «Olympia Park»
Customer:
BMW
Dates:
Start - 19.09.2011, End - 17.01.2012
Status:
Completed 100%

A new office of BMW in Moscow is a very good example of Design & Build conception when the designing and the construction are entirely performed by the same company. The goal of the designing team was to create within the aggressive duration an interior which would meet BMW high standards of quality. The style of interior is simple and laconic, color palette is understated, layouts are motivated by clear functionality. The lighting became the main instrument which allowed make the office comfortable and gain individuality to the space. For that, there were used suspended down lights and reflected-light luminaires ensuring to control the illumination depending on period of the day. The systems of “smart lighting” are located by perimeter of the work space and help to create an ambient of personal comfort in the general work area. Though the interior of the bigger coffee-point is kept to general style, it however creates quite a different mood conducing the rest and happy hour.

«

An effective and functional Gint-M team secured the completion of all the works in accordance with all standards and contractual requirements, which full met our expectations.

Reviewed fully

Related projects